Technical points of installation of building formwork

- May 15, 2018 -

1. Install the bottom of the building template, the beam bottom of the building template at both ends of the building template at the top of the beam at the gap, the following uphold with the column, in the use of wedge or spiral base height adjustment, beam bottom construction template installation requirements straight.

2. Install the side molds, place the beam side mold against the beam bottom building template on the cross beam at the top of the pillar, and clamp the side molds with the clamps. The side molds shall be vertical, and the upper side of the edge beam shall be fixed with hard wood and diagonal braces. The upper side of the beam side mold shall be top-tightened with the bottom building template of the floor slab. Temporary bracing should be used between the beam side building templates.


Related Industry Knowledge

Related Products

  • Plywood Shuttering Boards
  • 18mm Black Film Face Plywood
  • Ply Board
  • Plywood 4x8 Film Faced Poplar Plywood
  • Construction of Plywood
  • Black 18mm 4*8 Film Faced Concrete Shuttering Plywood